How it works

From the drawing to a quote you can explain.
Five steps. You make the calls.

Veriti is CNC quoting software for machine and job shops. It reads the customer's drawing and drafts the quote with your shop's rates and rules. You check the draft against the print, change what's off, and approve it. Step through one below.

How Veriti drafts a CNC quote

It reads the drawing.

You start from a draft.

Every line shows its work.

You make the call.

Your call sticks.

  1. 01 · Read Veriti reads the title block, notes, tolerances, GD&T and finishes, and pins every detail that moves the price to the spot it came from. If something isn't on the print, it doesn't guess. It asks you.
  2. 02 · Draft Veriti lays out the quote the way you do: operations, hours, rates, outside vendors, material and margin, priced with your shop's own rates and rules. No blank sheet.
  3. 03 · Show work You still read every print. Now you check a draft against it. Click any line to see the drawing feature, the note and the rule that priced it, so you can back up every number.
  4. 04 · Correct Something off for your shop? Change it and say why, in a few words. When someone asks later, the answer is on the quote. Veriti asks if it should become a shop rule.
  5. 05 · Next job The next 17-4 job comes in priced your way and says which rule it used. You made that call once. You don't type it in again.

Veriti drafts. You decide.

8877665544332211DDCCBBAAREVDESCRIPTIONDATECADD CHROME, GRIND03/26TITLEDRIVE SHAFT, 2.00 BOREDWG NO.VS-20750REVCSCALE1:4MATERIAL17-4 PH SSQTYCUSTOMERTOLERANCES UNLESS NOTED.XX ±.01 .XXX ±.005 ∠ ±0°30′FINISH125 Ra U.O.N.SHEET1 OF 1Ø7.5001.256.004.503.003.502.5020.75 ±.01Ø5.010 +.005/−.000HARD CHROME PER NOTE 4Ø4.500Ø4.248Ø3.5430 ±.0005↗.001A-BØ1.998 ±.002 THRU⊥.002A3216ABEND VIEW12× Ø17/32 THRUEQ SP ON Ø6.000 B.C.4× 1/2-13 UNC-2B▽ .754× Ø.7575/.7570 REAM⌖Ø.001ANOTES:1. MATERIAL: 17-4 PH STAINLESS, COND. H1150 (HRC 33–35).2. REMOVE ALL BURRS. BREAK SHARP EDGES .005–.015.3. GLASS BEAD BLAST ALL UNPLATED SURFACES.4. HARD CHROME PLATE Ø5.010, GRIND AFTER PLATE.5. ETCH PART NO. AND REV APPROX WHERE SHOWN.6. INTERPRET PER ASME Y14.5.1245678910111213141516171819?
Demo · RFQ-0412 · Qty 3 Drive shaft, 2.00 bore
Demo · RFQ-0415 · Qty 12 Wear sleeve, 17-4 PH
Pricing details Source
  • 1 Material 17-4 PH stainless exact
  • 2 Condition H1150 · HRC 33–35 exact
  • 3 Quantity 3 pcs RFQ
  • 4 Overall length 20.75 ±.01 exact
  • 5 Max OD (stock) Ø7.500 exact
  • 6 Chrome OD Ø5.010 +.005/−.000 exact
  • 7 Mid OD Ø4.500 exact
  • 8 Shaft OD Ø4.248 exact
  • 9 Bearing journal Ø3.5430 ±.0005 exact
  • 10 Bore Ø1.998 ±.002 thru exact
  • 11 Bolt holes 12× Ø17/32 on Ø6.000 BC read
  • 12 Tapped holes 4× 1/2-13 UNC-2B exact
  • 13 Reamed holes 4× Ø.7575/.7570 · pos Ø.001 exact
  • 14 Runout .001 to A-B exact
  • 15 Perpendicularity .002 to A exact
  • 16 Journal finish 32 Ra exact
  • 17 Chrome finish 16 Ra exact
  • 18 Plating Hard chrome, grind after read
  • 19 Blast Glass bead, unplated exact
?
Needs you: chrome thickness isn't called out. Note 4 says plate, not how thick. Confirm with the customer before this goes out.
Line Basis Amount
Material $760 × 3 + 20% $2,736
Turn & bore EFF-017 11.88 h × $115 $1,366
OD grind 4.5 h × $125 $563
Mill, drill & tap EFF-017 6 h × $105 $630
Jig bore EFF-017 3.25 h × $120 $390
Hard chrome OSP-009 Vendor $660 + 15% $759
Post-chrome grind 2.8 h × $125 $350
Deburr, blast & etch 1.7 h × $85 $145
CMM inspection TOL-004 3.5 h × $95 $333
Margin 30% of price MRG-003 $3,117
Total $10,389
Why this line No rule

±.0005 at 32 Ra with .001 runout won't hold off the lathe. Grind it.

9 Bearing journal: Ø3.5430 ±.0005 14 Runout: .001 to A-B 16 Journal finish: 32 Ra
Why this line OSP-009

Note 4 calls hard chrome on Ø5.010. Plater's lot charge plus a per-piece price, marked up per your rules.

6 Chrome OD: Ø5.010 +.005/−.000 18 Plating: Hard chrome, grind after ? Chrome thickness: Not called out
Turn & bore · run hours 7.5 9.38
Reason (required) 17-4 runs slower on our machines. Figure 1.25× on run time.
Make this a shop rule?
EFF-017 17-4 PH runs 1.25× normal run time. Applies to run time on turning, milling and jig bore, on every 17-4 job.
Just this quote Save rule
Your shop's rules · 38 saved

How you quote today

Three ways to quote a part.
Each makes you do it twice.

01 · A spreadsheet, then the ERP

Type it in. Then type it again.

It works, and it holds your rates. Not your calls. So you copy the last close quote, key in the new print and make the calls again. The ERP keeps the quote. It doesn't write it, so you type it in there too.

02 · Estimating software you script

Change one rule? Ask the consultant.

The vendor or a consultant writes your pricing as code. When a call changes, you wait on them, and fix it by hand on every quote until they do.

03 · Black-box AI quote

Drawing in. Number out.

Fast. But it can't show you how it got the number. When it's off, you fix it by hand on every part. Your name still goes on it.

You're not putting your name on a quote you can't explain.

So we built one you can.

Questions

About the draft

Can AI read an engineering drawing well enough to quote from it?

Well enough to draft from, with you checking. Veriti reads the title block, notes, tolerances, GD&T and finishes on the customer's drawing and pins every pricing detail to the spot on the print it came from. If something the price depends on isn't called out, like a plating thickness, Veriti flags it instead of guessing, so the question goes to the customer before the quote goes out.

Will AI replace estimators?

Not the judgment. With Veriti, AI drafts the quote and the estimator makes the call: they check each line against the print, change what's off, give a reason and approve it. Nothing goes out without their approval. Every detail in the draft is pinned to the spot on the print it came from, so the estimator's time goes to checking and judgment instead of keying.

How do you quote CNC parts faster?

Stop typing the same things twice. Veriti reads each drawing and drafts the quote with your rates and rules, so you correct a draft instead of keying in the print. A correction saved as a shop rule applies to later quotes it fits, and approved quotes go into JobBOSS² without retyping. More RFQs get answered with the hours you already have.

How is Veriti different from a machine shop quoting spreadsheet?

A machine shop quoting spreadsheet holds your rates and the math, but you still key in each print's details and remake the same pricing calls on every quote. Veriti reads the drawing, fills in the details with where each one came from, and applies your shop's rules. You check the draft against the print. When you correct a line, the fix can become a shop rule.

All questions

Check Veriti’s math against yours.